Fast Facts

Area

1,936.56 hectares

Sectors

14

Parking Lots

99

Police Stations

30

State Police Personnel

12,461

Central Paramilitary Personnel

40

CCTV Cameras

85

Variable Signboards

30

Fire Stations

30

Length of Roads Laid

156 kilometers

Pontoon Bridges

18

Length of Pipelines for Water

550 kilometers

Water Tap Connections

20,000

Active Water Tube Wells

40

Kilowatt Hours of Power Consumed

30 megavolt amperes

Length of Electricity Lines

770 kilometers

Streetlights

22,000

Private Electrical Connections

130,000

Electrical Substations

73

Allopathic Hospitals

14

Homeopathic Hospitals

12

Ayurvedic Hospitals

12

Hospital Beds

370

Individual Toilets

35,000

Public Toilets

340

Trench Patterns

7,500

Non-conventional Toilets

1,000

Temporary Bus Stations

5

Regional Buses in Operation

892

Local Buses in Operation

3,608

Pilgrims (estimated)

120,000,000

Pilgrims in Residence for Fifty-Five Days (estimated)

5,000,000

Train Stations in Operation

7

Trains in Operation

750

People Lost During Festival (estimated)

200,000

 

Source: http://kumbhmelaallahabad.gov.in